Loading...
Checkoff Sheet MS-2014-00962_0001.tif i i i Triton LLClfritonExterior 4028615500 p.15 2o I RESIDENTIAL CODE 4�1 CITY OF BLAIR. REROOFING CHECKOFF SHEET Return to Blair City Hall parlor to Final inspection 218 S i 6 Street, Blau, NE 68008 Because of lirnl =atlons caused b the ins jndtc com�lianc d wi with lo flowing requir menfs not interfere wI h reroofing worm, pleas followln this reroofing job. Permit #: . Installation Date YE No The materials and methods of application used for recovering or replaclrig the existing roof covering comply with the requirements of the building code. (R907.1) L11 I� ICE PROTECTION INSTAI.LED: An ice barrier �� ad bifume�rosn��was�l�d and - a ment or of a self - adhering polym e exterior underl y extends at lea —m the cave's e to a point at least 24 inches inside th wail line 7 6a building. p906.2.7.1) STRUCTURAL CC3MPON ©of over ng sys em and the material and eq uipment loads capable of suplaarting e 4 that will be encountered during installation of the roof covering system. (M07.2) [ E)tISTING C4VERIi�G 1NAS R (ED, EA18ting roof covering was removed for one of the reasons required by section 8907.3 Nb RUSTED METAL OR FLASHING Existing vent flashing, m etel edges, drain out ?ets, co €lays or metal counter flashing viere not reinstalled if rusted. R907.6} [ [ FLASHING INSTALLED PFtOP1 =R�L - Flashing shall be reconstructed in accordance w ith approved manufacturer's instaiiafiion instructions. [Aetal flashing to which primed prior to installation. (R9p7.6) bituminous materials are to be adhered shall be Signature of Primary Installer Date {L VD a t Signature t'f Permit Hader