Checkoff Sheet MS-2014-00961_0001.tif i
I
Triton LLC/Triton Exte rio r 4028615500 p.16
2009 INTERNATIONAL RESIDENTIAL, CODE.�
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
2`18 S �16 Street, Blair, NE 68808
Because of limitltaons caused by the infeasibility to perform detained nnspeations wbiclt would
not interfere with reroofing worlf, please indicate Compliance with the following requirements
� this reroofing job.
Perlin 9.
Installation lDafe..
YES No
❑ The materia and methods of app[ €cation used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at [east two layers of
underiayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the cave's edge to a point at least 24 inches inside the exlerlor
wall line of the building. (R906.2.7•
5Ti RUCT[.IRAL coMPONENTS ARE~ SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment toads
that will be encountered during installation of the roof covering system. (8907.2)
❑ EXISTING CO1fERIUG WAS REMOVEl7. Existing roof covering was removed for one
of the reasons required by section R9D7.3
❑ NO R ClsTlwD o metal O counteSHas�hing were n of reinstalled Ven flashing c if rusfed e (I�° D d rai n
.� }
outlets, coll
❑ FLASHING 1NSTALLEa pRDI'iRLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to he adhered shall be primed prior to installation. (R007.6)
Signature of Primary Installer Date
'i
n
D 9
Signal e o Permit o or