Loading...
Checkoff Sheet MS-2014-00959_0001.tif i Triton LLC/Trito n Exterior 4028615500 p.4 249 INTERNATI RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair Cit Hain prior to Final inspection 218 S 1 Street, Blair, NE 68008 B ecaus e of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fnllowin this reroofing jab. Permit #• d . Installation date; YES NO The materials and methods of application used for recovering or rep iaGing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point: at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) [ STRUCTURAL- CCMPUNENTS ARE SQUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11957.2) EXISTING COVERiIrfG WAS REmoVED. Existing roof covering was removed for one of the reasons required by section 8907.3 LAID R1;STEp 11JIETAI i7R frLASHiNG. Existing vent flashing, metal edges, drain outlets, collars or metal countar- flashing were not reinstalled if rusted. (11907.5) i © PLASHING INSTALLED PROPE RL.Y: Plashing shall be reconstructed in accordance i with approved manufacturer'al(a #io n instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Prlmaq Installer Date &� 1 Q'M�� j0 *5 Signature 6f Permit H 1der ate