Loading...
Checkoff Sheet MS-2014-00958_0001.tif 1 I Triton LLC/Trito n Exte rio r 4028615500 p.3 2 INTERNATIONAL RESIDENTIAL ODE CITY OF 3LAIR REROOFING CHECKOFF SHEET Return to Blailr city Hain prior to Final inspection 218 S 1 6 Street, Blair, NE 66008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. Permit # Installation Date; ,�,kr YE$ RO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. {R9l) A) ICE PROTECTION 11�STALLED: An ice barrier that consists umen she was_ ins d underlayment or of a self adhering polymer modif bitumen extends et least frorn t e cave's ed a to a point at least 24 inches inside the exterior wall line of the building. (11905.27.1) (� STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads covering system. (8907.2) that will be encountered during installation of the roof {� EXISTING GQVEFiii�iG WAS REMOVEDs Ex'ssling roof covering was removed for one of the reasons required by section 8907.3 ® No RUSTED META[. ©R i~1_AS1iING: Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were riot reinstalled if rusted. (R907.5) [� LASH INSTALLED pROPERM f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.5) Signature of Primary Installer date Signature of Permit K lder D a