Loading...
Checkoff Sheet MS-2014-00957_0001.tif i Triton LLC/Trito n Exterior 4028615500 P.1 2009 INTERNATIONAL RESIDENTIAL CODE i -- i CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspection 218 S 16 Street, Blair, NE 08008 Because of limitattons caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements folloV, this reroofing job. Permit: (� Installation bate: YES RO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.9) i (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least tWb layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior `mail line of the building. (11906.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® ExiSTING CaVERING WAS RENIOV)wC]: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTi E© METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) PLASHIRG INSTALLED PROPERLY: FIashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be pruned prior to installation. (R907.6) I Signature of Primary Installer Date Signature of permit H ider Da