Loading...
Checkoff Sheet MS-2014-00955_0001.tif I Triton LLC/Trito n Exte rio r 4028615500 p.2 i 009 INTERNATIO RESIDENTIAL C ODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Half prior to Final Inspection 218 S "16 Street, Blair, NE 68008 Because of limitations causes[ by the infeasibility to*parform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. Permit #: Installation Date; -- YES NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) I Q� Q ICE PROTEGTIQN INSTALLED: An ice harrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 2 cinches inside the exterior wail line of the building. (11905.2.7A) STR JCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads thatwiil be encountered during installation of the roof covering system. (8907.2) EXIST[RG COVERING WAS REMOVED: Existing roof covering was removed far one of the reasons required by section 8907.3 1'J ® NO RIJSTEl ) METAL Ol, FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLA-9 111G iNSTALLED PROPERLY" Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which W materials are to be adhered shall be primed prior to installation. (11907.6) I i Signature of Pmary Installer pate ri D e Signature bf permit Holder i I