Checkoff Sheet MS-2014-00955_0001.tif I
Triton LLC/Trito n Exte rio r 4028615500 p.2
i
009 INTERNATIO RESIDENTIAL C ODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Half prior to Final Inspection
218 S "16 Street, Blair, NE 68008
Because of limitations causes[ by the infeasibility to*parform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing Job.
Permit #:
Installation Date; --
YES NO
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
I
Q� Q ICE PROTEGTIQN INSTALLED: An ice harrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 2 cinches inside the exterior
wail line of the building. (11905.2.7A)
STR JCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
thatwiil be encountered during installation of the roof covering system. (8907.2)
EXIST[RG COVERING WAS REMOVED: Existing roof covering was removed far one
of the reasons required by section 8907.3
1'J ® NO RIJSTEl ) METAL Ol, FLASHING. Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLA-9 111G iNSTALLED PROPERLY" Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
W materials are to be adhered shall be primed prior to installation. (11907.6)
I
i
Signature of Pmary Installer pate
ri
D e
Signature bf permit Holder
i
I