Loading...
Checkoff Sheet MS-2014-00572_0001.tif i 1 Triton LLC/Trito n Exte rio r 4028615500 p.8 e 2009 INTE ATIONAL RESIDENTIAL CODE CITY OF FLAIR REROOFING CHECKOFF SHEET Return to Riair C� y Hall' prior to Final Inspection 218 16th Biair, NE 68008 Because of limitations caused by the infeasibility to 'perfarm detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requ trements following this reroofing job. Permit Installation Date: YES NO (� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.i) ICE PROTECT tQM INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (12906.21A) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING GOV1wR[NG WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL. OR FLASHING: Existing vent flashing, metal edges, drain � outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.6) D ® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Installer Date D t Signature of Permit Holdsr i i