Checkoff Sheet MS-2014-00571_0001.tif i
r
Triton L LCfFriton Exte rio r 4028615500 p.9
24091 E NIA I
SID NTIAL E
CITY OF BLAIR. REROOFING CHECKOFF SHEET
Return urn fio Blair City
y Hall prior to Final inspection
218 S I iP street, Blair, NE 68008
Because of limiltatlons caused by the infeasibility to *Perform detailed inspections which would
not interfere with reroofing work, please indicate camPilance with the following requirements
fo I -IOW ling this reroofing job.
Permit
Installation Date:
YES NO
( Q
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
® ICE PROTECTION INSTALLED: An ice harrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at (east frog the eave's edge to a point at least 24 inches inside the exterior
wall litre of the building. (8905,2.7.1)
STRUCTURAL COMPONENTS ARi SCUNR: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one
of the reasons required by sectlon 8907.3
® No RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain
outlets, collars or metal counter - hashing were not reinstalled if rusted. (R907.5)
® FLASHING INSTALLED PRO PERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R9 07 .6)
Signature of Primary Installer Date
i
Da
Signature f Permit older e