Loading...
Checkoff Sheet MS-2014-00571_0001.tif i r Triton L LCfFriton Exte rio r 4028615500 p.9 24091 E NIA I SID NTIAL E CITY OF BLAIR. REROOFING CHECKOFF SHEET Return urn fio Blair City y Hall prior to Final inspection 218 S I iP street, Blair, NE 68008 Because of limiltatlons caused by the infeasibility to *Perform detailed inspections which would not interfere with reroofing work, please indicate camPilance with the following requirements fo I -IOW ling this reroofing job. Permit Installation Date: YES NO ( Q The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ® ICE PROTECTION INSTALLED: An ice harrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at (east frog the eave's edge to a point at least 24 inches inside the exterior wall litre of the building. (8905,2.7.1) STRUCTURAL COMPONENTS ARi SCUNR: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by sectlon 8907.3 ® No RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain outlets, collars or metal counter - hashing were not reinstalled if rusted. (R907.5) ® FLASHING INSTALLED PRO PERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R9 07 .6) Signature of Primary Installer Date i Da Signature f Permit older e