Loading...
Checkoff Sheet MS-2014-00570_0001.tif i f Triton LLC/TritonExterior 4028615500 p.7 2009 (NAT RNIATI l A�. RE SIDENTIAL l'] CITY OF BLAIR REROOFING CHECKOFF S HEET Return to Btairr City y Hall prior to Final inspection 218 5 iia Street, Biair, NE 68048 Because of limitations caused by the Infeasibility to'perform detailed inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing job, Permit V: Installation date: , ---- - ---- YES NO Q The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.9) ICE PROTEC'ilo I INSTALLED: An ice barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a point at least 24 inches Inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL caMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 j O RUSTED METAL OR F ASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (11907.5) I i i ❑ PLASHING INSTALLED PROPERLY.lashirzg shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date A ignatureof ermlt & HOI er at I I i