Loading...
Checkoff Sheet MS-2014-00569_0001.tif i Triton L LC/Trito n Exterior 4028615500 P.5 i i 2009 INTERNATIONAL R IDENTI . ODD - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City, Hall prior to Final Inspection 210 S I C , Street, dair NE 68000 Because of Eimitations caused by the infeasibility to - perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the boding code. (R907A) lcE PROTECTION INSTALLED. An ice barrier that consists of at least two layers of hering polymer modified bitumen sheet was installed and underlayment or of a self ad extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8900.23.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that gill be encountered during installation of the roof covering system, (;907.2) EXISTING COVERIMG WAS REMOVEC3: Existing roof covering was removed for one of the reasons required by section 8907.3 C3 NO RLISTEd METAL OR FLASHING: Existing vent flashing, metal edges, drain ouilets, collars or metal counter - flashing were not reinstalled if rusted. (R997.5) FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) I i Signature of Primary installer Date A ignatur 4 of Permit Holder D e