Loading...
Checkoff Sheet MS-2014-00568_0001.tif Triton LLC(TritonExterior 4028615500 p.6 i I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Bidir City bail prior to Final Inspection 218 S W" Street, Blair, NE 68008 Because of limitations caused by the infeasibility to 'perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements following this rerooiingjob, Permit Installation Date: t1 -- YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building cede. (R907.1) C3 lC>= PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the cave's ed a to a point at least 24 inches inside the exterior wall line of the building, (11905.2,7.1) STRUCTURAL COMPONENTS ARE SOUMD.* The structural roof components are j capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907.2) EXISTING CQVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED MUAL OR FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) o Signre of Prima nstaller Da atu Signature of Permit Holder Date I