Loading...
Checkoff Sheet MS-2014-00550_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE i CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior t© Final Inspection 218 S 16" Street, Blair, NE 68000 Because of limitations caused by the infeasibility to perform detailed inspections which woul d not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. ✓ Property Address, M 5 ' Contractor or Homeowner (if self] Permit #: S- 2014 - Installation Date: YE NO The materials and methods of application used for recovering or replacin the existing roof covering comply with the requirements of the building c ode. (89137, � ICE PROTECTION INSTALLEil, An ice harrier that consists of at leas t two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the oave's ache to a paint at least 24 in inside the exterior wall line of the building, (Rg05,2.7,1) STRUCTURAL. COMPONENTS ARE The structural roof c omponents are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (8907,2) JJ/ 0 EXISTING Ct VER1NG IJ4l.AS REMOVED: Existing roof covering was removed for one of the- reasons required by, section R907,3 DID NOT USE RUSTEl3 OR FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED I'ROI' RL1C. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature Primary Installer ate Signature of Permit Holder P . i I