Loading...
Checkoff Sheet MS-2014-02616_0001.tif i ERD 402 - 861 -0002 p.3 2009 INTERNATIONAL RESIDENTI CITY OF BL AIR REROOFING G E KOFF SHEET _ Return to Blair City Hail prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility t4 perform detailed inspections which would LOA interfere with reroofing work, please indicate compliance with the following requirements foil_ owing this- reroofing ' job, Property Address: _ -! �'_ Contractor or Homeowner if sel Permit #: M - 2014 33 q J ' Installation Date: - 22- ES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a -self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE -SOUND: The structural'roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. '(R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing ent flashing, meta g g, t I edges, drain outlets, collars or metal counter - flashing were'- not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing hall be reconstructed 9 n acted in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed priorto installation. (11907.6) - r i t im In Ilex ate Ign of Pe Id r ate