Checkoff Sheet MS-2014-02616_0001.tif i
ERD 402 - 861 -0002 p.3
2009 INTERNATIONAL RESIDENTI
CITY OF BL AIR REROOFING G E KOFF SHEET _
Return to Blair City Hail prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility t4 perform detailed inspections which would
LOA interfere with reroofing work, please indicate compliance with the following requirements
foil_ owing this- reroofing ' job,
Property Address: _ -! �'_
Contractor or Homeowner if sel
Permit #: M - 2014 33 q J '
Installation Date: - 22-
ES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a -self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE -SOUND: The structural'roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. '(R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing ent flashing, meta g g, t I edges,
drain outlets, collars or metal counter - flashing were'- not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing hall be reconstructed 9 n acted in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed priorto installation. (11907.6)
- r
i t im In Ilex ate
Ign of Pe Id r ate