Checkoff Sheet MS-2014-02583_0001.tif te-'nLA GI 't S0Y BLAI'R REROOFING CHECKOFF SHEET
Return to Blair City , all prior t Final inspection
16 Street, Blair, NE 6804
Because of limitations caused by the infeasibility to perform detailed inspections which would
Rot interfere with reroofing work, please indicate compliance with the following requirements
followingg_ this reroofing job.
Property Address 'Y \ � y l!�
� V i
i
Contrac or Homeowner (if self) : ac l l �°
Permit #: -2014- N
1 '
installation Date:
YES NO
The materials and methods of application - used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An
ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edae to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural ro f components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing, oof covering g e ng was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING: Ex vent flashing, metal edges,
drain outlets, collars, or' meta[ counter - flashing :Were not'reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shalt be primed prior to installation. (8907.6)
Signatur ary ins al Date
S' a ure of Perm' o er Da e
i
i
I