Loading...
Checkoff Sheet MS-2014-02544_0001.tif M Y] REROOFING 2009 INTERNATI ' ONAL RESIDENTIAL CODE Return to lair ty all prior t Final Inspection 2 18S1 6 t h Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements folloM this reroofing job. Property Address: Contractor or Homeowner (if self) : '� L Permit #: - 2014 - O Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at Least two layers of underlaymen# or of a self- adhering polymer modified bitumen sheet was installed and � extends at least from the eave's edge to a paint at least 24 inches inside the exterior wall line of the building: (R905.2.7.1) i STRUCTURAL. COMPONENTS ARE SOUND: The str P uctural roof components are ca able of su ortin the roof covering system and the material and equipment loads pp. g that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing; roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars, or metal counter - flashing were no# reinstalled if rusfied. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) lurtel �s a er Date I Holder Date