Loading...
Checkoff Sheet MS-2014-02543_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOF,ING CHECKOFF SHEET Return to lair t �ty all prio t Final Inspection j 18 1 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. ` Property Address: .2. 11� , I "" Contractor or Homeowner (if self) : Q ua i Permit #: - 2014 - Installation Date: _ Lz YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at [east two layers of underlayment or ,of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting, the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING: COVERING WAS REMOVED; Existin roof c g covering was removed for one of the reasons required by section 8907.3 DID NOT USE `RUSTED METAL OR FLASHING- Existing vent flashing, meta( edges, drain outlets, collars, or metal counter- flashing were not reinstalled' if rusted. (R907.5) FLASHING INSTALLED PROPE I' RLY: F•lashing shall be reconstructed in accordance with approved manufacturer`s installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signatur ary Install r Date Si er Date I