Loading...
Checkoff Sheet MS-2014-02542_0001.tif j 2009 INTERNATIONAL RESIDENTIAL CODE i REROOFING SHEET Return to lair tit inspection Hall prior to Final 2 18S16 Street, Blair, NE 6800 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements 1211__ owing this reroofing ' Job. Property Address: ✓CJ D D N '� , (/ Contractor or Homeowner (if self)(11'� Permit #: MS -2014- _��5 Z4 I Installation Date YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907,) i ICE PROTECTION INSTALLED . An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905,2.7.1) I STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system (8907.2) EXISTING COVERING WAS REMOVED: Existing, oof covering g was removed for one i of the reasons required by section - R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, dram outlets, collars or metal counter flashing were not reinstalled if rusted. {8907.5} FLASHING INSTALLED PROI�EFtLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signatur Date Si o P er _Date