Loading...
Checkoff Sheet MS-2014-01739_0001.tif i w° l� i ? => . MIDENTIAL CODE Return to B 11air City Hall prtor to Final Ins P ection 2' j6th reef, Stair, NE 6 3 Because of limitations caused y the Inf asiblil°ty to detailed inspections which would not Interfere with reroofing wotki please Indicate corn liat'ce with the following requirements k Llowing this reroof ng, job. f° . Permit M. Installation Date= YES NO The materials and methods of application used for recovering or replacing the existing ' roof covering comply with the requirements of the building cede. (8907.1) i Imp _ INSTALLED: ED: Rn ice harrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen street was Installed and extends at leas# from th$ eave's edge to a point at least.24 Inches inside the exterior C wall line of the building. (R.905,2.7.1) §mRwCTL' QOMP 3NENTS 1 SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that Will be encountered during installation of the roof covering system. (8907.2) EXISTING .COVET ING.1tVA S MOVE29- Existing roof covering was removed for one i of the reasons required by section 8907.3 t N o RUSTED ll ETAL OR FLASHING: Existing vent flashing, metal edges, drain j outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.6) ' I FLASHING INS `ALLED P&QkRL ; Flashing shall be reconstructed in accordance with approved manufacturers Installation instructions. Metal fleshing to which bituminous mate ri is are to be adhered shall be primed prior to installation. (11907.6) ( I i Signature of Primary Installer Dite 1 %gnture of Permit Folder D6te I i i I