Checkoff Sheet MS-2014-01662_0001.tif i
i
10/13/2014 07:34 FAX 4025332173 Z001/001
IN"TERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF S
Return to Blair City Hall prior to Final Inspection
218 S '1 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
not Interfere with reroofing work, please Indicate compliance with the following requirements
following this- reroofing job.
Property Address:
Contractor or Horinspwrter (if self) .
Permit M MS- 2014 - 0
Installation Date � � � � C
YES NO
I� The materials and me t hods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayrnent or of a self-adhering polymer modified bitumen sheet was Installed and
extends at least from the eave's edge to a point at least 24 inches Inside the exterior
wall line of the building. (8905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structuraF roof components are
capable cif supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL, OR FLASHING: Existing vent flashing metal edges,
drain outlets, collars or metal counter were not reinstalled If rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation, (11907.6)
Signs ure o Primary Installer Date
Signature of Permit Holder Date
I