Loading...
Checkoff Sheet MS-2014-01457_0001.tif ERD 402 - 861 -0002 p.1 2 0091 NT ERNATIONAL RESIDENTI CITY OF BLAIR R EROOFING C • CKOFF SHEET Return to Blau City Hall prior to Final inspection 218 S 16 1h Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would Amt interfere with reroofing work, please indicate compliance with the following requirements following this- reroofing job. Property Address: 26 a _ ! ( t' Contractor or Homeowner (if self) Permit #: MS -2014- - 6 I �• Installation Date: E NO ❑ The materials and methods of ap plication used for co pp r re voting or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ' �% ❑ IC PROTECTION INSTALLED An ice Barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE -SOUND. The structural'rpof components are capable of supporting the roof coverings system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I ❑ EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vend flashing, metal edges, drain outlets, collars or metal counter - flashing woM not reinstalled if rusted. (R907.5) ❑ - FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) g, G of P" a ns alley /Date Ste Lure of P frn older d to r •