Loading...
Checkoff Sheet MS-2014-01449_0001.tif I i ERD 402 -861 -0002 p.2 I INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHE i Return to Blair City Hatt prior to Final Inspection 218 S 16 Street Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the fallowing requirements following thin reroofing job. Property Address: Contractor or Homeowner (if self) Permit #: MS- 2014- Installation Date: YE NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION INSTALLED An Ice barrier that consists of at least two layers of + ++ underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The strucfural'roof components are capable of supporting the roof covering system and the material and equipment leads that will be encountered during installation of the roof covering system. .(8907.2) ❑ EXISTING COVERING WAS REMOVED: Misting roof covering was removed for one ( of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL. OR FLASHING: Existing veni flashing, metal edges, drain outlets, collars or metal counter - flashing wers�not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) r e of I ry nstaller ate ► ature of en it 140aer p r