Checkoff Sheet MS-2014-00795_0001.tif .009 INTERNATIONAL RESIDENTIAL
CITY OF
LAIR REROOFING CHECKOFF SHEET i
Return to Blair city Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility fia'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit
Installation Date:
I
YES NO
The materials and methods of a pplication used for recovering or replacing the existing j
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of j
of modified bitumen sheet was Installed and
underlayment or of a self - adhering polymer point at least 24 inches inside the exterior
extends qt least from the _ eave's e dge to a
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND and the material and equipment loads
capable of supporting the roof covering system
that will be encountered during installation of the roof covering system. (R907.2)
Existing roof covering was removed for one
® EXISTING COVERING WAS REMOVED : g
of the reasons required by section R907.3 i
NO RUSTED METAL OR PLASHING: Existing vent installed flashing
ifm etal rusted. (R907.5)
outlets, collars or metal counter - flashing were not r
I`
LASHING INSTALLED PROPERLY: Plashing shall be reco in ac cordance
with approved manufacturer's installation instructions. Metal flashing o ac
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
_3 P
Date
S e of Primary Installer
G � ri S •� 3 � -
`� Date
S gnat e of Permit Holder