Loading...
Checkoff Sheet MS-2014-00795_0001.tif .009 INTERNATIONAL RESIDENTIAL CITY OF LAIR REROOFING CHECKOFF SHEET i Return to Blair city Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility fia'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit Installation Date: I YES NO The materials and methods of a pplication used for recovering or replacing the existing j roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of j of modified bitumen sheet was Installed and underlayment or of a self - adhering polymer point at least 24 inches inside the exterior extends qt least from the _ eave's e dge to a wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND and the material and equipment loads capable of supporting the roof covering system that will be encountered during installation of the roof covering system. (R907.2) Existing roof covering was removed for one ® EXISTING COVERING WAS REMOVED : g of the reasons required by section R907.3 i NO RUSTED METAL OR PLASHING: Existing vent installed flashing ifm etal rusted. (R907.5) outlets, collars or metal counter - flashing were not r I` LASHING INSTALLED PROPERLY: Plashing shall be reco in ac cordance with approved manufacturer's installation instructions. Metal flashing o ac bituminous materials are to be adhered shall be primed prior to installation. (R907.6) _3 P Date S e of Primary Installer G � ri S •� 3 � - `� Date S gnat e of Permit Holder