APPLICATION FOR OPPD APPROVAL TO CONSTRUCT DISTRIBUTED
GENERATION (DG) INTERCONNECTION
Submit this completed application to your OPPD Electric Service Designer or Account Executive
(please call 636 -3535 If you do not know your OPPD contact).
The Distributed Generation (DG) Owner (herein described as 'Owner') requests OPPD approval
to construct and operate Distributed Generation (DG) equipment in closed transition (parallel)
with the OPPD system in accordance with and as defined in the latest version of the OPPD DG
Manual.
DG Facility Owner and /or Operator Information:
DG Facility Owner Marc Blais
OPPD Service Account Number (if known) 1111 1 000 0 10
Address 2247 Meadow Dr City Blair StateNE Zip code
Day Phone -427 -3743 Night Phone 402-426-9011 Fax
Email dmab @abbnebraska.com
DG Facility Operator (if different than above) SAME AS ABOVE
Address City State_ Zip code
Day Phone Night Phone Fax
Email
Facility Design / Engineering:
Company Wind and Solar Specialists
Representative Meier
Address 102 Main St City Alta State IA Zip code
Phone 712-200-2281 Fax 712-200 -4021 E ma il tommeier @wassus.com
Facility Electrical Contractor:
Company Fremont electric
Representative Les Shalberg
Address 1245 Hills Rd City Fremont StateNE Zip code ;
Phone 402 - 727 -4932 Fax 402 -727 -8124 Email lshallberq @fremontelectricinc.co
DG Facility Information:
DG Facility Name Marc Blais
Address 2247 Meadow Dr City Blair StateNe Zip code
Service Entrance Voltage /Phase: 240 /single
DG Facility Load Information:
(The following load information will be used for interconnection design purposes. The information
Is not intended as a commitment or contract for billing purposes)
Revised 01/02/2002 45
�1
Minimum anticipated DG facility load (generation not operating)
kW: 0 kVA: 0
Maximum anticipated OG facility load (generation not operating)
kW: 13.72 kVA: 17.15
Distributed Generation / Equipment Information (attach manufacturer's data):
Description of number and type of generating units: solarworld Plus SW 280 mono panels
36- panels feeding to a Fronius IG Plus Advanced 10.0 -1 inverter
13 panels feeding to a Fronius IG Plus Advanceed 3.8 -1 Inverter
inverters fed to grid through the customer pane
Generator Manufacturer(s)/ Model(s) Solarworld Plus SW 280 mon
Fronius IG Plus advanced 10.0 -1 inverter
Fronius IG plus Advance 3.8 -1 inverter
Generator Ratings (indicate per unittoombi ed)
Peak rated output 9.995 +3. 1 12.995 kW 12.4 +3.8 1 16.244 WA
Continuous rated output 9.995 +3 / 12.995 kW 12.4 +3.8 1 16.244 WA
Power Factor •85-1 ind. /cap. (circle) - lead / lag fixed / variable
Generator unit output voltage: 240 Phase 1 X 3
Inverter Data (if applicable):
Direct Energy Converte nverter/ atic Power Converter (Circle one) NA/Synchronous /Induction
for synchronous: Grounding Resistor Y,l Resistor size or current Iimit
Generator subtransien} reactance:
for Induction: VAR source and location (if req'd)
Transformer (if applicable):
If transformer(s) will exist between the generation and the facility service entrance /interconnection
point, describe transformer(s) (voltage, windings (wye -wye, etc.), type, taps, ratings) and attach
manufacturers data
N/A
Classification:
Owner requests Classification of interconnection as (check one):
R • Ia ss I Type A nrlass I Type B
OClass II Class III
Duration of Parallel Operation:
Owner requests Duration of Parallel Operation (check one):
nApproved as Momentary _X Approved as Sustained
Power Transfer:
Does the DG Facility Owner intend the DG facility to export pow 1 9/ the OPPD
system now, or at any time in the future? (circle one): NO
Revised 01/02/2002 46
Owner Requests Description of Power Transfer as (check one and complete kW):
❑ import-only kW level for parallel operation - kW
W export level = 0 kW
Import/Export kW level for parallel operation = 13.72 kW
kW export level = 13.72 kW
Export-only kW level for parallel operation = kW
kW export level = kW
Comments:
Paralleling Equipment:
Description of number and type of paralleling switchgear or momentary transfer switch(es) (attach
manufacturer's data) see attached
Interconnection Disconnect:
Description of interconnect disconnect(s) and installed location(s) (attach manufacturer's data)
Square D DU23213- 60 A Isolation disconnect located at the meter on the SE corner of the
residence
Interconnection Breaker (if applicable):
Description of interconnection breaker(s) and Installed location(s) (attach manufacturer's data)
Siemens 2 pole 60 A 120/240 circuit breaker located in residence circuit panel
Protective Relaying:
Description of protective relaying (attach manufacturers data -see 'submittals' below)
see attached info
Schedule:
Date scheduled for start of DG Installation / construction 10 -6 -2014
Date scheduled for completion of installation / construction 10 -10 -2014
Revised 01/02/2002 47
Submittals:
Submit the following documents with this application:
• a site plan and floor plan of the proposed DG facility and /or installation indicating installed DG
equipment locations.
• a one -line diagram of the proposed generator installation on the Owner's electrical system,
noting all bus voltages, conductor properties, generating equipment, interconnection point(s),
and interconnection disconnecting device(s). Note: OPPD may require this document bear
the stamp of a Professional Electrical Engineer registered In the state where the project is
being constructed.
• a schematic diagram of the proposed protective relay scheme indicating CT and PT
monitoring points and protective functions provided (when required): Please contact OPPD in
advance for assistance in determining OPPD's protective relay requirements for specific
applications. If available at time of application, provide AC and DC elementary /wiring
drawings and relay settings (with calculations and assumptions).
• Note: OPPD may require these documents bear the stamp of a Professional Electrical
Engineer registered in the state where the project Is being constructed.
• detail sheets /catalog cuts of information on the generator, interconnection disconnect switch,
Interconnection breaker, interconnection switchgear, or other related equipment.
Comments
By submitting this application, the Owner agrees to the following:
• The Owner has reviewed, is familiar with, and agrees to comply with all requirements of the
OPPD DG Manual.
• The Owner has reviewed and is familiar with the terms of the 'Utility Service Termination
Clause' for failing to meet and maintain requirements for interconnection, as outlined in the
DG Manual.
• The Owner has reviewed and is familiar with the 'Interconnection Expenses' section of the
OPPD DG Manual, and is aware of and agrees to comply with the Owner's financial
obligations to OPPD, incurred by the addition of this new DG capacity.
• At no time will the new DG equipment be allowed to operate in closed transition with the
OPPD system until the 'OPPD Agreement for Closed Transition Operation of Distributed
Generation' is executed between the Owner and OPPD. This includes momentary closed
transitions between the Owner's generation and the OPPD system for testing or calibration
purposes. The only exception is if the DG installation is essentially complete, OPPD has
been notified in advance of the intention to operate in parallel, and an OPPD representative is
present to witness the closed transition operation. Note such witness tests do not necessarily
take the place of the final 'Witness Test' outlined in the 'OPPD Agreement for Closed
Transition Operation of Distributed Generation'. Owner shall be liable for any and all
damages and expenses incurred by OPPD and Its customers due to the unauthorized
or improper closed transition operation of Owner generation with the OPPD system.
• The operation of this Owner equipment during the test period and subsequent normal
operation shall not cause objectionable electrical disturbances external to the DG facility.
Revised 01/02/2002 48
• All members of the Owner's construction project team (including contractors, engineers, and
suppliers) and all DG facility operating personnel will be made aware of the terms of the
OPPD DG Manual and this application.
FOR THE CONTRACTOR 1-11 & -
Printed 'Ta - rct` L. Na C-
Signed this 10' Day of SEP 7— l y
FOR THE DG FACILITY OWNER*
Printed m a �r \a :5
Title C� ,0�
Signed this yrH Day of
THIS AREA FOR OPPD USE ONLY
The Owner has provided the following required documents for OPPD review.
- completed 'Application for Approval to Construcf form rec'd 9 - 7a - ?gr Y
- one -line diagram rec'd -lo .- /y
- a schematic diagram of the relay scheme (when required) recd
- data sheets for generator and other equipment rec'd 9-&• Lo1 , t
- other 51 T E ?1-41-j recd r; -1 o'< 2oi y
Classification of Interconnection (check one):
V!Class I Type A (Interconnection disconnect and interconnection breaker not
required, protective relaying required)
_Class I Type B Interconnection disconnect required? (circle) Y / N
Interconnection breaker required? (circle) Y / N
Protective relaying required.
_Class II (Interconnection disconnect, interconnection breaker, and
protective relaying required)
_Glass III (Interconnection disconnect, interconnection breaker, and
protective relaying required)
_NIA (open transition) DG Manual requirements do not apply for open transition
_N /A (rejected) Network service or other
Duration of Parallel Operation (check one):
_Approved as Momentary (Interconnection disconnect required, interconnection
breaker not required, minimal protective relaying
required)
Z Approved as Sustained (Interconnection disconnect required, interconnection
breaker required, protective relaying required)
Description of Power Transfer (check one):
— Import-only kW level for parallel operation = kW
kW export level = 0 kW
Import/Export kW level for parallel operation kW
o 10, kW export level = /7' kW
Revised 01/02/2002 49
,Export-only kW level for parallel operation = kW
kW export level — kW
Interconnection DescriptionlVoltage, Transmission /Distribution, ATO, transformer,
VA c— /&'d
OPPD Internal Department Comments:
Additional OPPD studies required? (circle) Yl�p_.
Description of required studies:
Modifications to the OPPD system required? (circle) Y / VO
Description of required modifications:
Does OPPD require reimbursement for Interconnection Expenses? (circle) YON
Description of required reimbursement items, with costs:
Telemetry required Y &
Description of telemetry required:
Additional information submitted by Owner upon OPPD request Y
Description of additional information submitted:
Owner Agreement to OPPD Stipulations:
OPPD requires the following studies /modifications /reimbursements:
Revised 01/02 /2002 50
The Owner agrees to modify the facility design and to reimburse OPPD as requested for studies
and OPPD system modifications described above:
FOR THE DG FACILITY OWNER:
Printed
Title
Signed this Day of
OPPD hereby grants permission to the above named Owner to proceed with the DG
interconnection installation as specified above. Any unapproved changes to the interconnection
shall void this agreement. This agreement is nontransferable. This approval is only for the
construction of the interconnection and does not convey OPPD approval of the operation,
functionality of the design, nor OPPD permission to operate the DG unit(s) in parallel with OPPD.
FOR OPPD:
Reviewed by the following OPPD departments:
(Initial)
_'::!:�-ommunications
_ tomerSales and Service
/Distribution Engineering or�ransmission Engineering
'::�Al� Metering v GM.C.;1 9�,�toiK
LL 1, PlanningvN 6n--1 n/trizpAi
'SPt h Substation / System Protection
/JF T & D Dispatchingv,G E ,- j -d `t✓i Z41t/
—4 Division Manager, Engineering
n t
Sighis l �, Day of Zpt
Revised 01/02/2002 51