Loading...
2247 Meadow Dr OPPD Distributed Generation Interconnection Permi.tif E mit AND - 0703 PU* PM1Wwd APPLICATION FOR OPPD APPROVAL TO CONSTRUCT DISTRIBUTED GENERATION (DG) INTERCONNECTION Submit this completed application to your OPPD Electric Service Designer or Account Executive (please call 636 -3535 If you do not know your OPPD contact). The Distributed Generation (DG) Owner (herein described as 'Owner') requests OPPD approval to construct and operate Distributed Generation (DG) equipment in closed transition (parallel) with the OPPD system in accordance with and as defined in the latest version of the OPPD DG Manual. DG Facility Owner and /or Operator Information: DG Facility Owner Marc Blais OPPD Service Account Number (if known) 1111 1 000 0 10 Address 2247 Meadow Dr City Blair StateNE Zip code Day Phone -427 -3743 Night Phone 402-426-9011 Fax Email dmab @abbnebraska.com DG Facility Operator (if different than above) SAME AS ABOVE Address City State_ Zip code Day Phone Night Phone Fax Email Facility Design / Engineering: Company Wind and Solar Specialists Representative Meier Address 102 Main St City Alta State IA Zip code Phone 712-200-2281 Fax 712-200 -4021 E ma il tommeier @wassus.com Facility Electrical Contractor: Company Fremont electric Representative Les Shalberg Address 1245 Hills Rd City Fremont StateNE Zip code ; Phone 402 - 727 -4932 Fax 402 -727 -8124 Email lshallberq @fremontelectricinc.co DG Facility Information: DG Facility Name Marc Blais Address 2247 Meadow Dr City Blair StateNe Zip code Service Entrance Voltage /Phase: 240 /single DG Facility Load Information: (The following load information will be used for interconnection design purposes. The information Is not intended as a commitment or contract for billing purposes) Revised 01/02/2002 45 �1 Minimum anticipated DG facility load (generation not operating) kW: 0 kVA: 0 Maximum anticipated OG facility load (generation not operating) kW: 13.72 kVA: 17.15 Distributed Generation / Equipment Information (attach manufacturer's data): Description of number and type of generating units: solarworld Plus SW 280 mono panels 36- panels feeding to a Fronius IG Plus Advanced 10.0 -1 inverter 13 panels feeding to a Fronius IG Plus Advanceed 3.8 -1 Inverter inverters fed to grid through the customer pane Generator Manufacturer(s)/ Model(s) Solarworld Plus SW 280 mon Fronius IG Plus advanced 10.0 -1 inverter Fronius IG plus Advance 3.8 -1 inverter Generator Ratings (indicate per unittoombi ed) Peak rated output 9.995 +3. 1 12.995 kW 12.4 +3.8 1 16.244 WA Continuous rated output 9.995 +3 / 12.995 kW 12.4 +3.8 1 16.244 WA Power Factor •85-1 ind. /cap. (circle) - lead / lag fixed / variable Generator unit output voltage: 240 Phase 1 X 3 Inverter Data (if applicable): Direct Energy Converte nverter/ atic Power Converter (Circle one) NA/Synchronous /Induction for synchronous: Grounding Resistor Y,l Resistor size or current Iimit Generator subtransien} reactance: for Induction: VAR source and location (if req'd) Transformer (if applicable): If transformer(s) will exist between the generation and the facility service entrance /interconnection point, describe transformer(s) (voltage, windings (wye -wye, etc.), type, taps, ratings) and attach manufacturers data N/A Classification: Owner requests Classification of interconnection as (check one): R • Ia ss I Type A nrlass I Type B OClass II Class III Duration of Parallel Operation: Owner requests Duration of Parallel Operation (check one): nApproved as Momentary _X Approved as Sustained Power Transfer: Does the DG Facility Owner intend the DG facility to export pow 1 9/ the OPPD system now, or at any time in the future? (circle one): NO Revised 01/02/2002 46 Owner Requests Description of Power Transfer as (check one and complete kW): ❑ import-only kW level for parallel operation - kW W export level = 0 kW Import/Export kW level for parallel operation = 13.72 kW kW export level = 13.72 kW Export-only kW level for parallel operation = kW kW export level = kW Comments: Paralleling Equipment: Description of number and type of paralleling switchgear or momentary transfer switch(es) (attach manufacturer's data) see attached Interconnection Disconnect: Description of interconnect disconnect(s) and installed location(s) (attach manufacturer's data) Square D DU23213- 60 A Isolation disconnect located at the meter on the SE corner of the residence Interconnection Breaker (if applicable): Description of interconnection breaker(s) and Installed location(s) (attach manufacturer's data) Siemens 2 pole 60 A 120/240 circuit breaker located in residence circuit panel Protective Relaying: Description of protective relaying (attach manufacturers data -see 'submittals' below) see attached info Schedule: Date scheduled for start of DG Installation / construction 10 -6 -2014 Date scheduled for completion of installation / construction 10 -10 -2014 Revised 01/02/2002 47 Submittals: Submit the following documents with this application: • a site plan and floor plan of the proposed DG facility and /or installation indicating installed DG equipment locations. • a one -line diagram of the proposed generator installation on the Owner's electrical system, noting all bus voltages, conductor properties, generating equipment, interconnection point(s), and interconnection disconnecting device(s). Note: OPPD may require this document bear the stamp of a Professional Electrical Engineer registered In the state where the project is being constructed. • a schematic diagram of the proposed protective relay scheme indicating CT and PT monitoring points and protective functions provided (when required): Please contact OPPD in advance for assistance in determining OPPD's protective relay requirements for specific applications. If available at time of application, provide AC and DC elementary /wiring drawings and relay settings (with calculations and assumptions). • Note: OPPD may require these documents bear the stamp of a Professional Electrical Engineer registered in the state where the project Is being constructed. • detail sheets /catalog cuts of information on the generator, interconnection disconnect switch, Interconnection breaker, interconnection switchgear, or other related equipment. Comments By submitting this application, the Owner agrees to the following: • The Owner has reviewed, is familiar with, and agrees to comply with all requirements of the OPPD DG Manual. • The Owner has reviewed and is familiar with the terms of the 'Utility Service Termination Clause' for failing to meet and maintain requirements for interconnection, as outlined in the DG Manual. • The Owner has reviewed and is familiar with the 'Interconnection Expenses' section of the OPPD DG Manual, and is aware of and agrees to comply with the Owner's financial obligations to OPPD, incurred by the addition of this new DG capacity. • At no time will the new DG equipment be allowed to operate in closed transition with the OPPD system until the 'OPPD Agreement for Closed Transition Operation of Distributed Generation' is executed between the Owner and OPPD. This includes momentary closed transitions between the Owner's generation and the OPPD system for testing or calibration purposes. The only exception is if the DG installation is essentially complete, OPPD has been notified in advance of the intention to operate in parallel, and an OPPD representative is present to witness the closed transition operation. Note such witness tests do not necessarily take the place of the final 'Witness Test' outlined in the 'OPPD Agreement for Closed Transition Operation of Distributed Generation'. Owner shall be liable for any and all damages and expenses incurred by OPPD and Its customers due to the unauthorized or improper closed transition operation of Owner generation with the OPPD system. • The operation of this Owner equipment during the test period and subsequent normal operation shall not cause objectionable electrical disturbances external to the DG facility. Revised 01/02/2002 48 • All members of the Owner's construction project team (including contractors, engineers, and suppliers) and all DG facility operating personnel will be made aware of the terms of the OPPD DG Manual and this application. FOR THE CONTRACTOR 1-11 & - Printed 'Ta - rct` L. Na C- Signed this 10' Day of SEP 7— l y FOR THE DG FACILITY OWNER* Printed m a �r \a :5 Title C� ,0� Signed this yrH Day of THIS AREA FOR OPPD USE ONLY The Owner has provided the following required documents for OPPD review. - completed 'Application for Approval to Construcf form rec'd 9 - 7a - ?gr Y - one -line diagram rec'd -lo .- /y - a schematic diagram of the relay scheme (when required) recd - data sheets for generator and other equipment rec'd 9-&• Lo1 , t - other 51 T E ?1-41-j recd r; -1 o'< 2oi y Classification of Interconnection (check one): V!Class I Type A (Interconnection disconnect and interconnection breaker not required, protective relaying required) _Class I Type B Interconnection disconnect required? (circle) Y / N Interconnection breaker required? (circle) Y / N Protective relaying required. _Class II (Interconnection disconnect, interconnection breaker, and protective relaying required) _Glass III (Interconnection disconnect, interconnection breaker, and protective relaying required) _NIA (open transition) DG Manual requirements do not apply for open transition _N /A (rejected) Network service or other Duration of Parallel Operation (check one): _Approved as Momentary (Interconnection disconnect required, interconnection breaker not required, minimal protective relaying required) Z Approved as Sustained (Interconnection disconnect required, interconnection breaker required, protective relaying required) Description of Power Transfer (check one): — Import-only kW level for parallel operation = kW kW export level = 0 kW Import/Export kW level for parallel operation kW o 10, kW export level = /7' kW Revised 01/02/2002 49 ,Export-only kW level for parallel operation = kW kW export level — kW Interconnection DescriptionlVoltage, Transmission /Distribution, ATO, transformer, VA c— /&'d OPPD Internal Department Comments: Additional OPPD studies required? (circle) Yl�p_. Description of required studies: Modifications to the OPPD system required? (circle) Y / VO Description of required modifications: Does OPPD require reimbursement for Interconnection Expenses? (circle) YON Description of required reimbursement items, with costs: Telemetry required Y & Description of telemetry required: Additional information submitted by Owner upon OPPD request Y Description of additional information submitted: Owner Agreement to OPPD Stipulations: OPPD requires the following studies /modifications /reimbursements: Revised 01/02 /2002 50 The Owner agrees to modify the facility design and to reimburse OPPD as requested for studies and OPPD system modifications described above: FOR THE DG FACILITY OWNER: Printed Title Signed this Day of OPPD hereby grants permission to the above named Owner to proceed with the DG interconnection installation as specified above. Any unapproved changes to the interconnection shall void this agreement. This agreement is nontransferable. This approval is only for the construction of the interconnection and does not convey OPPD approval of the operation, functionality of the design, nor OPPD permission to operate the DG unit(s) in parallel with OPPD. FOR OPPD: Reviewed by the following OPPD departments: (Initial) _'::!:�-ommunications _ tomerSales and Service /Distribution Engineering or�ransmission Engineering '::�Al� Metering v GM.C.;1 9�,�toiK LL 1, PlanningvN 6n--1 n/trizpAi 'SPt h Substation / System Protection /JF T & D Dispatchingv,G E ,- j -d `t✓i Z41t/ —4 Division Manager, Engineering n t Sighis l �, Day of Zpt Revised 01/02/2002 51