Checkoff Sheet MS-2014-01479_0001.tif Oct 09 1410 :21 a Jim Geiger & Son 402- 504 -4367 p.1
Oct. 9. 2014 9:49AM CITY OF BLAIR (402. 426. 4191) No. 7q4! i'. 1
Oct {7140234 Jim 0eigor & 8on 402- 604 -4367 p.4
RESIDENTIAL 2009 INTERNATIONAL CODE
CITY I Ft CHECKOFF SHEET
Return to Blair City Mall prior to Final Inspeotian
218 B 10 Btreei, Blair, HE 68008
ancauss of lilmitaftons caused by the Infeasibility to perform detailed inspection which wound
not interfiare with verooting work, please indloa'te compliance with the foliowtnS requirements
tnt owin this rr aroof na job.
t
trtstaliatlon Date:
1
YES No 1
Q
The rrratwiais and methods of application used forreauvering tx-repladng the eAsling
root' covering comply with the requlrements o'ftha building code. (R907.1)
tC
PROTECTICK INSTALLED: An ice barrier that consists of at least two layers cif
underlayment or of a self - adhering polymer modified bhuman street wFas ins'wiled and
exte6ds at ft save's edgB a point at least 24 inches inside the exgrlor
wall line oTttha building. (R905.2.7.11
aTft GTI)RAL CCiMPONE111'i'5 ARE SOUND: The structural roof components era
oapabte of supporting the roof covering system and the material and equipment loads
_ that wiii be encountered during installation of the roof covering eystem, (R9072)
J'
ExtshrwG CQVERIMr- WAS RV[W VED: Existing roof covering was removed for one
of the reasons requ'uad by section R907.3
Nt7 RUSTED E7'Al- dR FLASHING Existing vent flashing, metal edges, drain
oatletR, collars or rnetal counter- fteshing were not reinstotied if rusted. (11907.5)
i
FLASHING INSTALLED PIS PSRLY: Flashing shell be reconstructed in accordance
with approved manufacturer's installation instruotions. Metal fistshing to which
hituminous materials are to he adhered shall be primed prior to instaNation. (8207.5)
8 i ig n at u?d of T r mart' ns -ta r Date
S1g a f Po it older ete
i
!