Loading...
Checkoff Sheet MS-2014-01097_0001.tif i Oct 09 1410:21 a Jim Geiger & Son 402 -504 -4367 p.2 Oct, 9. 2014 9:49AM CITY Oil BLAIR (402.426.4191) Nc.5441 u 3 Oct 071 4 02:34p kn Geiger,& Son 402 - 504.4367 p.3 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF I ! i { BLAIR REROOFING OFF SHEET Return to Blair City- Hail prior to Final inspection 218 8 18 Street, Blair, NE 68006 Because of limitation caused by the Infeaslbllity to perform detailed Inspections which would not Interfere with reroofing work, please indicate complianco vuith the fallowing requirements following this reroofing lob. I � Permit #: . r o f d' -- i� Installation [fate: �'��' ;..-wf YES NO The materials and mathads of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8007.1) tcE PRA`rgcjio IN�V STAL LIwf] ; Are Ice tartlet' that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet 3gas installed ar►d extaenofs at least from the eaves edge to a point it leil k 24, 10 e inside the exterior ; wall fine of thth$ bui lding, (R906.2.7.1) i Q STRUCTPRAl_ CQM!10NEN1rS ARE gV; UN0; The structural roof components are capable of supporting the roof covering system and the material and equipment loads that wJJJ be arscountered during installation offhe roof covering system. (R007.2) Q EXISTING COVERING WAS PLEMOVED: Existing roof covering-was rerno ed for one of the reasons required by section 8907.3 i NQ P.U.%7EI3 IJ rzrAL OR FLASHINCti: Exfeting vent flashing, metal edges, strain outlets, collars or metal counter- flashing were not reinstalled is' rusted. (R907.5) a i IN3TAi PROPERLY: Flashing shall be reaoneiructed in socordanre wlth approved manufacturer's installation Instructions. Metal flashing to which � bituminous materials are to be adhered shall be primed prior to installation, (8907.8) signat ra of hs liar Bate ��j OA Sig at Pe it icier Data