Checkoff Sheet MS-2014-00675_0001 (2).tif i
Oct 09 14 10:21 a Jim Geiger & Son 402 - 504 -4367 p,3
Oct, 9. 2014 9; 49AM CITY OF BLAI R (402. 426. 4191) No. 5441 r. I
i
Oct 0714 D2'34p Jim Gager & Son 402 -604 -4357 p.2 j
2009 INTERNATIONAL RESIDENTIAL CODE
CITY F B LAIR REROOF OFD S HE ET
Return to Blair City mall prior to Final inspection
218 S 16"' Street, glair, NE 68000
Seoause of limitations caused by the inFeasibitityto perform detailed inspections which would
not Ifntarferewith reroofing work, please Indicate compliance with the foftwing requirements
fotlowin this reroofing job.
Permlt #; co(o_`S
Installation Efate,:
YES NO
Q The materials and.methads of application used for recovering or repladrig Etas existing
roof covering comply with the requirements of the building code. (11907,1)
- Q ]O PRt7TEQTI+'ON INSTALLED ice barrier that consists of at least two letyers of
underlayment or of a saif- adhering polymer modified bitumen sheet m in piled and J
extends at toast from the eave'g edrip, bo a paint at least 24 Inches Inside the exterior
wall line of the building. (11906.2.7.1)
,PL- C1 STRUCTURAL COMPONENT$ AIRS SOUND: The structural roof fiomponertis are
capable of supporting the roof covoring system and the material and equipment loads
that will be ertnauntered during installation of the roof covering system. (R807,2)
Q EXISTING CQYERING WAS REMOVED: rxisting roof covering was removed for one
of the reasons required by section 8907.3
I3 Nib RUSTED MI!YAL OR FLASHING, Existing vent flashing, .metal edges, drain
outlets. collars or rmetel counter-flashing were not reInstalled if rusted. (R907.5)
Q FLASH11W INS PROPERLY: Flashing shah be reconstructed in accordance
with approved rnanufaaWrv''s installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed pX +or to in9taliation. (R907.6)
Signs fie 6f €' Data
r
e • I M1 ti
Sign f Pe iL older a-t�