2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BL REROOFING ■ ■E KO F SHEET.
�
Return to Blair City Hell prior to Final inspection
218 S 18 Street, Blain, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
no interfere with rer oofing work, please indicate compliance with the following requirements
following this - reroofing job. ,!
Property Address;
Contractor or Homeowner (if self) 6 l v 1 .
Permit #.- MS- 20'!4 - 0 6 If 93 Sidi Co. a ' ► t
P PG.- Box 5
Installation bate: 1 120 No. Main
Louisville NE, 6803
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
h underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends. at least from the eave's edge to a point at least 24 Inches inside the exterior
wall line of the building. (11905.2.7.1)
STRUCTURAL COMPON5NTS ARE -SOUND: The structural components are :#
capably: cif supporting the roof cornering system and the material and equipment loads
that will be erioountered during installation of the roof cover system. (8907.2)
Q EXISTING COVE -RING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing w6re not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
Signatur fi ri any Installer bate