Loading...
Checkoff Sheet MS-2014-00493_0001.tif l I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BL REROOFING ■ ■E KO F SHEET. � Return to Blair City Hell prior to Final inspection 218 S 18 Street, Blain, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would no interfere with rer oofing work, please indicate compliance with the following requirements following this - reroofing job. ,! Property Address; Contractor or Homeowner (if self) 6 l v 1 . Permit #.- MS- 20'!4 - 0 6 If 93 Sidi Co. a ' ► t P PG.- Box 5 Installation bate: 1 120 No. Main Louisville NE, 6803 YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of h underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends. at least from the eave's edge to a point at least 24 Inches inside the exterior wall line of the building. (11905.2.7.1) STRUCTURAL COMPON5NTS ARE -SOUND: The structural components are :# capably: cif supporting the roof cornering system and the material and equipment loads that will be erioountered during installation of the roof cover system. (8907.2) Q EXISTING COVE -RING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing w6re not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) Signatur fi ri any Installer bate sil Sig ature P alder Date i