Loading...
Checkoff Sheet MS-2014-02838_0001.tif 9 INTERNATIONAL RESIDENTIAL TIAL D DE SHEET CITY BLAIR REROOFING CHECKOFF SHEET to Blair C!" Hall prior to Final Inspection 21 8 S i 6 Street, Blair, NE 6500 8 Because of ('imitations caused by the infeasibility to'perform detailed inspections which would j to com liance with the following requirements not interfere with reroofing work, please indica p following this reroofing job. Permit 14 Installation Date: YES NO [� The materials and methods of application used for recovering or replacing the existing 4: roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers o underlayment or of a self - adhering polymer modified bit m inches ins'de� the a extero r extends at least from the Pave s edge to a point at lea wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads 3 that will be encountered during installatiori of the roof covering system. (8907.2) (� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 71 0 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I f fi �p ? `- Date Signature of Primary Installer Signature d Permit Holder Date f r ! �