Checkoff Sheet MS-2014-02838_0001.tif 9 INTERNATIONAL RESIDENTIAL TIAL D DE SHEET
CITY BLAIR REROOFING
CHECKOFF
SHEET
to Blair C!" Hall prior to Final Inspection
21 8 S i 6 Street, Blair, NE 6500 8
Because of ('imitations caused by the infeasibility to'perform detailed inspections which would
j
to com liance with the following requirements
not interfere with reroofing work, please indica p
following this reroofing job.
Permit
14
Installation Date:
YES NO
[� The materials and methods of application used for recovering or replacing the existing
4:
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers o
underlayment or of a self - adhering polymer modified bit m inches ins'de� the a extero r
extends at least from the Pave s edge to a point at lea
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
3 that will be encountered during installatiori of the roof covering system. (8907.2)
(� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
71 0 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
I
f fi �p ?
`- Date
Signature of Primary Installer
Signature d Permit Holder Date
f
r ! �