Loading...
Checkoff Sheet MS-2014-02139_0001.tif i 10/06/2014 12:10 4025545809 HSCONT PAGE 01/01 00 INTERNATIONAL RESIDENTIAL COD.E. CITY OF BLAIR REROOFIN.0 CHECKOFF SHEET Return to Blau City ball prior to Final Inspection 216 S 1 .Street, Blair, NE 68008 Because of limitations caused by the infeasibilityy to perform detailed Inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing job, Property Address; Contractor or Homeowner (if self) i PermiW: MS-2014- Installation Date: - - -. -L ! YES NO _ 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) I ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (8905.2,7,1) STRUCTURAL COMPONENTS ARE SOUND', The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907,2) EXISTiNG COVERING WAS REMOVED: Existing roof oovering was removed for ons i of the reasons required by section R907.3 DID NOT USE RUSTED FETAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.6) i FLASHING INSTALLED PROPERLY, Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be pruned prior to installation. (R9073) / °C - l3 Allatof Prim ry Installer Date i Signature of permit Hold 6r pate