Loading...
Checkoff Sheet MS-2014-01076_0001.tif i Oct.08.2014 11:14 AM PAPILLION WINDOWS & SIDIN 4025971777 PAGE. 2/ 2 009 INTERNATIO RES IDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspection . 218 S i6 Street, Blair, NF- 88008 Because of limitations caused by th date compliart a detailed Inspections requirements uirements no Interfere with reroofing work, please Ind foflowlM this reroofingjob. Permit C — 0 installation Date: NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907,'1) ❑ ICF pRO rEGTION INSTALLS : An ice barrier that consists of at lest two layers of underlayment or of a self - adhering polymer modified bitumen sheet was ' stall d and extends _at least frnfrom he save' ed a to a point at least 24 inc es i side the exterior wall line of the building. (R905.2.7.1) ST_R ()TUR L COMPONENTS ARE SC]lIN ,. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (8007.2) © ISTIN i VI =FBI SAS REMOV Existing roof covering was removed for one of the rea s required by section 8907.3 ❑ I USTEa 11 ETAL [�i l^LAsHiNG: Existing vent flashing; metal edges, drain outlets, collars or metal counter - flashing were riot reinstalled if rusted, (R907.5) ® FLASH NG INSTALLED pRQE_RLY Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R007.0) Signat of taller Da Dale Sign I i I