Checkoff Sheet MS-2014-00947_0001.tif i
i
Oct 071411;36a Hahn Roofing 515 -573 -7460 p.2
INTERNATIONAL RESIDENTIAL
CITY OF BL AIR REROOFING CHEGKOFF SHEET
Return to Blair City Hall. prior to Final inspection
218 S 16 Street, Blair, NE 68088
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit 9: S120Iq' Caa
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edae to a point at least 24 inches inside the exterior
wall line of the building. (890527.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation.of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMC7VED: Existing roof covering was removed for one
of the reasons required by section R907.3
®
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
® FLASHING INSTALLED PRO 'ER LY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sig of Primary In er mate
Signatur`' . Permit Holder Date
I
i