Loading...
Checkoff Sheet MS-2014-00675_0001.tif i Oct 0714 02:34p Jim Geiger & Son 402 -504 -4367 p.2 i INTERN ATIONAL RESIDENTIAL CODE I CITY OF BLIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 I Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please: indicate compliance with the following requirements following this reroofing job. Permit #• �AG r Installation pate: ' YES NO ❑ ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ® ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I ❑ ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which l bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signs re 6f P Date I YIR b I ac. Sign f Pe wk older Elate I i