Loading...
Checkoff Sheet MS-2014-00319_0001.tif I i i - Oct, 7.2014 12:44PM. . 464$ P. 2 f.0 liv l I NTI No C ITY O F BLAIR REROOFING CHECK FF SHEET Return to Blair City Hall prig to Final Inspection 218 I6 Street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed Inspections which would riot interfere with reroofing work, please indicate compliance with the following requirements foil wing this reroofing job. �, l Property Address: 1 ( ! Contractor or Homeowner (if self) Permit . M -2014y Installation Date. 141 I YES NO i The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION' INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheetwas installed and extends at leastfromtlie eave's edge to a point at least 24 Inches inside the exterior wall line of the building: (8906.2.7.1) I ® STRUCTURAL COMPONENTS ARE -SOUND: The'structural'roof components are capable of supporting the roof covering, systemi and the material and equipment loads that will be er:countered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE DUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were reinstalled if rusted. (R907.5) I FLASHING INSTALLED PR Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) 1 / Si at re of Pri [ ta[ler ❑at IL) Signs ur of Permit older Date I