Checkoff Sheet MS-2014-02832_0001.tif i
10- 06 -'14 11;43 FROM - Absolute Customs T -186 P0001/0001 F -116
- W
2009 INTERNATIONAL RES IDENTIAL CO D E
CITY O F B LAIR RER OOFING CHECKOFF SHEEN'
Return to Blair city Hall prior to Filial Inspection
18 8 16"' Street, Blair, NE 68008
k3aoause of limitations caused by the o p erform detailed inspections which would
interfere with reroofing work, please indicate compliance Mth the following requirements
bolhow th is earoofing Joie.
Permit 4:
installation Date: !� e?2
YES Nil
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the build(ng code. (11907.1)
ICE PR+t]TF Tlt3M IqSTAiM f=ly: An lee barrier thalconsists of at least two layers of
underlaymenf or of a self - adhering polymer modifred bitumen sheet was installed and
extends at ie _frari Eire eaves ed
to a point at lest 24 inohe inside the exterior
wall line of the building. (R905.2.7.1) —
STRUC- rUpAL CoM pof4F - MTS. ARE SOUNDt The structural rood components are
capable of supporting the roof covering system andthe material and equipment loads
that will be encountered during installation of the roaf covering s�ratem. (8907.2)
EXISTING G0VFMjqG WAS R.lrltlIUVED. existing rod covering was removed for one
of the reasons required by section 8
No USTIrC? ETA (j EL tjlNG- Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flaahincg were ljot reinstalled if rusted. (R99f.b)
IF. LASHIMO M TALLgl7 E OPT LY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to whleh
bituminous materials are to be adhered shall be primed prior to installation. (Ro 07.6)
S iature of Primary Installer Da s
Signature of ertn7if Wa1deY mate
i
1