Loading...
Checkoff Sheet MS-2014-02832_0001.tif i 10- 06 -'14 11;43 FROM - Absolute Customs T -186 P0001/0001 F -116 - W 2009 INTERNATIONAL RES IDENTIAL CO D E CITY O F B LAIR RER OOFING CHECKOFF SHEEN' Return to Blair city Hall prior to Filial Inspection 18 8 16"' Street, Blair, NE 68008 k3aoause of limitations caused by the o p erform detailed inspections which would interfere with reroofing work, please indicate compliance Mth the following requirements bolhow th is earoofing Joie. Permit 4: installation Date: !� e?2 YES Nil The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the build(ng code. (11907.1) ICE PR+t]TF Tlt3M IqSTAiM f=ly: An lee barrier thalconsists of at least two layers of underlaymenf or of a self - adhering polymer modifred bitumen sheet was installed and extends at ie _frari Eire eaves ed to a point at lest 24 inohe inside the exterior wall line of the building. (R905.2.7.1) — STRUC- rUpAL CoM pof4F - MTS. ARE SOUNDt The structural rood components are capable of supporting the roof covering system andthe material and equipment loads that will be encountered during installation of the roaf covering s�ratem. (8907.2) EXISTING G0VFMjqG WAS R.lrltlIUVED. existing rod covering was removed for one of the reasons required by section 8 No USTIrC? ETA (j EL tjlNG- Existing vent flashing, metal edges, drain outlets, collars or metal counter- flaahincg were ljot reinstalled if rusted. (R99f.b) IF. LASHIMO M TALLgl7 E OPT LY: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to whleh bituminous materials are to be adhered shall be primed prior to installation. (Ro 07.6) S iature of Primary Installer Da s Signature of ertn7if Wa1deY mate i 1