Loading...
Checkoff Sheet MS-2014-02600_0001.tif I I ' .2009 INT: RNATIONAl__ RESIDENTIAL CODE CHIT1 OF SLAIR REROOFING CHECKOFF SH Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would Mot interfere with reroofing work, please indicate compliance with the following requirements followina this reroofing job. Permit Installation Date: __ `-- yrl YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edae 10 a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING IN PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which 2 bituminous materials are to be adhered shall be primed prior to installation. (R907.6) r- 30--1Y Sig lure of Primary Installer Date Sig ure of Pof6it Holder Date I