2009 INTERNATIONAL, RE'SWENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SKEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform, detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
foll� owing this reroofing job.
Permit #f: '(r ( w oq a
Installation Date: ia(Q — N
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
I
® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed a to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
I
® STRUCTURAL COMPONENTS ARE SOUND; The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED; Existing roof coverin was r
of the reasons required by section R907.3 g emoved for one
❑ to RUSTED METAL OR FLASHING: Existing vent flashing met edges,
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907 5)
FLASHING INSTALLED PROPERLY: Flashin
with approved manufacturer's installation instruct ons. Metal flashing to which ordance
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i
Sig lure of Primary Installer
Dale
Sig ure of P it Holrier