Loading...
Checkoff Sheet MS-2014-02123_0001.tif i i i I i 2009 INTERNATIONAL, RE'SWENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SKEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform, detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements foll� owing this reroofing job. Permit #f: '(r ( w oq a Installation Date: ia(Q — N YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I ® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) I ® STRUCTURAL COMPONENTS ARE SOUND; The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED; Existing roof coverin was r of the reasons required by section R907.3 g emoved for one ❑ to RUSTED METAL OR FLASHING: Existing vent flashing met edges, outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907 5) FLASHING INSTALLED PROPERLY: Flashin with approved manufacturer's installation instruct ons. Metal flashing to which ordance bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i Sig lure of Primary Installer Dale Sig ure of P it Holrier