Loading...
Checkoff Sheet MS-2014-01946_0001.tif 1 i AL RESIDENTIAL C inspection Return to Blair City Kali prior to pinal lnsp ec 218 S 16 {h street, Blair, WE 68008 orm Because of tlmitations:caused by the infeasibility t 0t Pe riance with following qu c ments not interfere with reroofing work, please indicate c P follovrin this reroofing job, Permit #: Installation Date: . I YES NO I ❑ The materials and methods requirements o used for recovering build ng code, replacing )the existing i roof covering comply with of ICE FROifECTIGN LED: An ice harrier that bitumen sheet r modified s_ installed a d underlayment or of a self- adhpnng polyme extends at least from the eavda edge to a point at least 24 inches inside the extenor wall line f the building. (R905.2.7.1) roof components are ® STRUCTURAL COMPONENTS ARE SO Stem and the material and equ ipment toads capable P., supporting sy t the roof covercovering y se m. (R907.2) that will be encountered during installation of the roof covering [I EXISTING COVERING WA S RE_ MOVED: Existing roof covering was removed for one ' of the reasons required by section 8907.3 ® metal edges, NO RUSTED METAL OR FLASHING: Existing vent flashing, drain I outlets, collars or metal oounter- flashing were not reinstalled if rusted. (R907. 5 ain ❑ FLASH NG INSTALLED pROpE!R Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.0) i Date Signature of primary Installer Signature of Permit older Date I I I