Loading...
Checkoff Sheet MS-2014-01890_0001.tif 20 KSIDE TIAL, CODE CITY F BL�AIR ERIN `HKOF� HILT Return to,alair city Hall' prior to Final Inspection 21 S i & Street, �B[air, .NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. I Permit #: Installation Date. " YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the bullding code. (R907.1) ICE PROTECTION CNSTALLED. An ice barrier that consists of at lea ass installed and underlayment or of a self -adhering polymer modified bitumen sheet extends at lem the eave's edge to a. point at least 2� inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof o e po ent loads s re capable of supporting the roof covering system and.the maters q p ion of the. roo that will be encountered during installat f covering system. {R907,.2) pu EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one ' ® of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING. Existing vent flashing, meta d Re07 5) drai tlets collars or mefial counter- flashing were not reinstalled ►f r ( I ou (� FLASHING INSTALLED PRgPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which o installation. (R907.6) bituminous materials are to be adhered shall be primed prior t r Date Signature of Primary Installer Date Aature 0 Permit Holder