Checkoff Sheet MS-2014-01890_0001.tif 20
KSIDE TIAL, CODE
CITY F BL�AIR ERIN `HKOF� HILT
Return to,alair city Hall' prior to Final Inspection
21 S i & Street, �B[air, .NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
I
Permit #:
Installation Date. "
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the bullding code. (R907.1)
ICE PROTECTION CNSTALLED. An ice barrier that consists of at lea ass installed and
underlayment or of a self -adhering polymer modified bitumen sheet
extends at lem the eave's edge to a. point at least 2� inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof o e po ent loads
s re
capable of supporting the roof covering system and.the maters q p
ion of the. roo
that will be encountered during installat f covering system. {R907,.2)
pu EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
' ® of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING. Existing vent flashing, meta d Re07 5) drai
tlets collars or mefial counter- flashing were not reinstalled ►f r (
I ou
(� FLASHING INSTALLED PRgPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
o installation. (R907.6)
bituminous materials are to be adhered shall be primed prior t
r Date
Signature of Primary Installer
Date
Aature 0 Permit Holder