Loading...
Checkoff Sheet MS-2014-01675_0001.tif 09/30/2014 10:49 4025545809 HSCONT PACE 01/01 L INTERNA RES CITY LAIR REROOFING CHECKOFF T Return to Blair City H a ll pl���r t� �i��t Inspection 21 8 16th Street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would _t interfere with reroofing work, please indicate complianc e with the following r equirements fbll0ALn this reroofing job. Property Address: b '' V -- Contractor or Homeowner ( if ael� : 1 < � _ �� �'�� = permit #: MS -2014- Installation fate: YES NO L The materials and methods of application used for r ecovering or replacing the exist roof covering comply with the requirements of the building code. (R9O7,1) j ICE PROTECTION iNSTALL An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed e to a point at least 24 inches inside the exterior well line of the building. (R908.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering systern and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED ME TAL, OR PLASHIN Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) PLAS' HiNC INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.0) —Awy A/ Si66atovof Prim ry installer bate Signature of Permit Hold r Date