Checkoff Sheet MS-2014-01601_0001.tif 09/30/2014 10:50 4025545909 HSCaNT PACE 01/01
I i_
CITY OF B L AIR R IN G CHECKOFF SHEET
Return to Blair City Hall priolr inspec 210 16 Street, Street, Blair, 111E 60000
13er'au6e of llmitatlons caused by the infeasiblllty to perform detailed inspections which wou d
DO interfere with reroofing worst, please indicate compliance with the following requirements
'f'cli� this reroofing job.
PropertY Address:
Contractor or Homeown (if selq :
- f
Permit #: MS-2014-0/6 1 0
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code'. (R907,1)
ICE PR07'IGTiON f STALL � .
ECG, An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed
extends at feast from the eave's and
ed a to ,a point at feast4 inches inside
wall line of the building, (R9O5 7 ) the exterior
STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are
capable Of supporting the roof covering syster and the mate rial a equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE DUSTED METAL OR P� Exfsting vent drain outi'ets, collars or metal counter-flashing l were of reinstalled a f rusted. edges,
lied. (R907.5)
FLASHING INSTALLED PROPER' v: F lashing shall be reconstructed in accordance
with approved Manufacturer's installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation, (8907.6
Si at cf �'rirrt rY lnstaller — `� o
Date
S ignature of Permit H old r
Gate
i