Checkoff Sheet MS-2014-01400_0001.tif 0 INTERNATIONAL RESIDENT
. 0
CITY OF BLAIR REROOFING CHI K FF SHE
Reurn Blair City Hall' prior to Final inspection
218 s '16 Street,. Blain, NE 6800
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements j
following this reroofing job.
Permit #:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers'of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
extends at lea ,t'from the eave's edge to a point at least .4 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The st� terial and equ ipment loads
capable of supporting the roof covering system and th
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COV> =RI�IC �NAS REMQVED Existing roofcovering was removed for one
. C
of the reasons required by section R907.3
[�
NO BUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
[�• FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6}
J-03
Signature Signature of rimary Installer Date
C - .
Signature o ermit Holder Date
. j
i