Loading...
Checkoff Sheet MS-2014-01400_0001.tif 0 INTERNATIONAL RESIDENT . 0 CITY OF BLAIR REROOFING CHI K FF SHE Reurn Blair City Hall' prior to Final inspection 218 s '16 Street,. Blain, NE 6800 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements j following this reroofing job. Permit #: Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers'of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at lea ,t'from the eave's edge to a point at least .4 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The st� terial and equ ipment loads capable of supporting the roof covering system and th that will be encountered during installation of the roof covering system. (R907.2) EXISTING COV> =RI�IC �NAS REMQVED Existing roofcovering was removed for one . C of the reasons required by section R907.3 [� NO BUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) [�• FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6} J-03 Signature Signature of rimary Installer Date C - . Signature o ermit Holder Date . j i