Checkoff Sheet MS-2014-01347_0001.tif 09/30/2014 10:27 4025545809 HSOONT PAGE 01/01
INTERNAT I
CITE OF BLAIR REROOFING CH ECKOFF
Return to Blair City Mall rlcr to Final I nspection
2 1 8 '1 Street, Blair, Nrz 68006
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing warn, please Indicate compliance with the following requirements
f+- 1l0W_'m_ this reroofing job.
Properly Add ' o
Atgc
Contractor or Homeowner (if self)
Permit #: MS-201
Installation Date:
YES NO
Q The materials and methods of application used for recovering or replacing the existing
roof covering gomply with the requirements of the building code.. (8907,1)
i
ICE PROTECTION INSTAL -LED: An ice barrier that consists of at least � t two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
wall line of the building. (R905.2,7,I
' STRUCTURAL C '
COMPONENTS Ai�� �cDUND: The structural roof cc�mportents are` i
capable of supporting the roof covering system and the material and equipment loads
that will be encountered wring installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existin g g a roof coveri was
removed for one
of the reasons required by section )907.3
Q DID NOT USE RUSTED METAL OR FLASHING; Existing ent flashin g f g, metal edges,
drain outlets, collars or metal counts r-flash ing were not reinstalled if rusted. (R907,5)
PLASHING INSTALLED PROPERLY; Flashin shall be e
Flashing r constructed In accordance �
with approved manufacturer's installation instructions, Metal flashing to which
bituminous rrlaterials are to be adhered shall be primed prier to installation. (8907.9)
Si at of Prim ry installer D
� of Hermit Hold r Date