Loading...
Checkoff Sheet MS-2014-01347_0001.tif 09/30/2014 10:27 4025545809 HSOONT PAGE 01/01 INTERNAT I CITE OF BLAIR REROOFING CH ECKOFF Return to Blair City Mall rlcr to Final I nspection 2 1 8 '1 Street, Blair, Nrz 68006 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing warn, please Indicate compliance with the following requirements f+- 1l0W_'m_ this reroofing job. Properly Add ' o Atgc Contractor or Homeowner (if self) Permit #: MS-201 Installation Date: YES NO Q The materials and methods of application used for recovering or replacing the existing roof covering gomply with the requirements of the building code.. (8907,1) i ICE PROTECTION INSTAL -LED: An ice barrier that consists of at least � t two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (R905.2,7,I ' STRUCTURAL C ' COMPONENTS Ai�� �cDUND: The structural roof cc�mportents are` i capable of supporting the roof covering system and the material and equipment loads that will be encountered wring installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existin g g a roof coveri was removed for one of the reasons required by section )907.3 Q DID NOT USE RUSTED METAL OR FLASHING; Existing ent flashin g f g, metal edges, drain outlets, collars or metal counts r-flash ing were not reinstalled if rusted. (R907,5) PLASHING INSTALLED PROPERLY; Flashin shall be e Flashing r constructed In accordance � with approved manufacturer's installation instructions, Metal flashing to which bituminous rrlaterials are to be adhered shall be primed prier to installation. (8907.9) Si at of Prim ry installer D � of Hermit Hold r Date