Loading...
Checkoff Sheet MS-2014-01698_0001.tif 2009 INTERNATIONAL RESI COD CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements i following this reroofing job. Property Address: c L Contractor or Homeowner (if self) : T CI 5 4 Permit #: MS -2014- G C �! Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are capable of supporting the roof covering. system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) L ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one (� of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent' flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance C with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) G � Signature Primary Installer Date, / Signature of Permit Holder Date I