Checkoff Sheet MS-2014-01698_0001.tif 2009 INTERNATIONAL RESI COD
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
i
following this reroofing job.
Property Address: c L
Contractor or Homeowner (if self) : T CI 5 4
Permit #: MS -2014- G C �!
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are
capable of supporting the roof covering. system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
L ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
(� of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent' flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
C with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
G �
Signature Primary Installer Date,
/
Signature of Permit Holder Date
I