Checkoff Sheet MS-2014-00659_0001.tif 09/29/2014 MON 10:02 FAX IZO08/010
I N
2009 lk�' ER"AT10FAI RESIDENXIAL CODE
CITY Of BLAIR REROOFING CHECKDFF SHEET
- a-turn to Blair City I-t"a H prior to Final in- paction
218 S 16" E ir&at, Blair, NE 68003
Because of lin taaons caused by the inf(�-4-imfity to perform detalle(I inspections which would
not interfere W reroofing work, please 'nd[cate compliance with tl i'ollowing requirements
following this. r o�ro ofing job,
Property Address:
Contractor or Vorric-owner (if self) 7
Permit #: MS
Installation Da'cc--;
XEP- NO
❑ The materials and methods of -.pplication used for recovering or replacing the existing
roof covering comply with the .-,(Juirernents of the building c:ode, (R907.1)
;0( ICIf P 1 INSTALU 11: An ice barrier that consisfs of at least two layers of
u nd, e' dayment or of a self-adhE ing, polymer modified bitumc. rt sheetwas installed and
e) "'Lends at least from the eave' e to a point at least 24 inches inside the exterior
wall line of the building. (R905,21.1)
❑ STRUCTURAL COMPONE ARE SOUND: The structural roof components are
capable of supporting the roof C-overing. system and the rna and equipment loads
4
that will be encountered durinc� installation of the roof cove system. (R907.2)
❑ EX COVERING WAS l F 100VED: Existing roof covering was removed for one
of fcfie reasons required by se0on R907.3
❑ DID NOT USE RUSTED MET/ OR FLASHING Existing venf flashing, metal edges,
drain outlets, collars or metal counter- flashing were reinstalled if rusted. (8907.5)
❑ FLf- INSTALLED PRU- Flashing shall be reconstructed in accordance
with approved manufacturer's - . - istallation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)
2
/S gria fure o Prir Installer Date
gignat6e Of PE nit Holder Date