Checkoff Sheet MS-2014-00406_0001.tif i
i
2009 INTERNATIONAL RESIDENTIAL CODE
C OF BLAIR REROOFIKG CHECKOFF SHEET
Return to B lair City Hall prig to Final inspection !,
M S 16 s t reet, Blair, NB 08008
13acause of limitations caused by the infoa 'sibility to perform dotailed Inspections which world i
not interfere with reroofing worm, please indicate compliance with the Hollowing requirements
follawinct this reroofing jab.
Property Address;
Contractor or Homeowner (if self)
� BARNES CONST . U PIO
Pernit #: MS -2014 1001 N. 67t4 Avonue
- :.... 0 -...
Instaliafibn Dafe: -_ r x(402) 672 -0870
YE§ NO
The materials and methods of application used fc)r recovering or replacing the e) isting
roof covering comply with the requirements of the building code. (R907.1) .
IC1= PRGTECTIQ INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave "s ed a to.a point at least 2,4 inches inside the exterior
-wall 1111o' of the building, (R905.2.7.1)
STRUCTURAL, COMPONENTS ARM SOUND: The structural root components are f
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
1= XISTING COVERING WAS REMOVE Q: J . 5xistin roof covering was removed for one
of the reasons required by section 8907.3
DID NOT. USE RUSTED METAL f FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted., (8907,5)
D FWHING INS TALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907,5)
Signature of P ')r �" Qafe
Signature Pa mit Ho der Date
I
I