Loading...
Checkoff Sheet MS-2014-00406_0001.tif i i 2009 INTERNATIONAL RESIDENTIAL CODE C OF BLAIR REROOFIKG CHECKOFF SHEET Return to B lair City Hall prig to Final inspection !, M S 16 s t reet, Blair, NB 08008 13acause of limitations caused by the infoa 'sibility to perform dotailed Inspections which world i not interfere with reroofing worm, please indicate compliance with the Hollowing requirements follawinct this reroofing jab. Property Address; Contractor or Homeowner (if self) � BARNES CONST . U PIO Pernit #: MS -2014 1001 N. 67t4 Avonue - :.... 0 -... Instaliafibn Dafe: -_ r x(402) 672 -0870 YE§ NO The materials and methods of application used fc)r recovering or replacing the e) isting roof covering comply with the requirements of the building code. (R907.1) . IC1= PRGTECTIQ INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave "s ed a to.a point at least 2,4 inches inside the exterior -wall 1111o' of the building, (R905.2.7.1) STRUCTURAL, COMPONENTS ARM SOUND: The structural root components are f capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) 1= XISTING COVERING WAS REMOVE Q: J . 5xistin roof covering was removed for one of the reasons required by section 8907.3 DID NOT. USE RUSTED METAL f FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted., (8907,5) D FWHING INS TALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,5) Signature of P ')r �" Qafe Signature Pa mit Ho der Date I I