Checkoff Sheet MS-2014-01108_0001.tif 13c h
2009 INTERNATIONAL RESIDENTIAL CODE
CITY. OF, BLAIR REROOFING CHECKOFF SHEET
Return to l Ir C ity Ha ll prior to in l Inspection
i
218 S 16 th S treet, Blai NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followin this reroofing job.
Property Address; v55 J n c J a ST
Contractor or Homeowner (if self):
Permit #; MS-20
installation Date.
YES NO
The materials and methods of application used for recovering or replacing the existi
roof' covering comply with the requirerrients of the buildin g code. { g ` R907,1)
#CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering, polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a paint at Fast 24 inches inside the exterior
wall line of the bullding: (R605.2.7.1)
STRUCTU,R.AL COMPt?IUgNTS ARE SOUND The structural roof components are
capable of supporting, the roof covering system and the material and equipment loads
that will be enceuritereu during installation of the roof covering system. (8907.2)
i
EXISTI �(JVERIN — W - - R___OVED. Existing, roof covering was removed for one
of the reasons required by section- 8907.3
DID NOT USE RUSTED M TAL a SLASH# G; Existing vent flashing metal edges
drain outlet , collars, or'metal counter f(a$l ing were riot reinstalled if rusted. (R907.5)
FLASHlNO .STALLED P. FERL,Y; Flashing shell be reconstructed in accordance
with approved manufacturer`s installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation. (R907.6)
7
Signature
Date
Sign of e o der li
Date