Loading...
Checkoff Sheet MS-2014-01108_0001.tif 13c h 2009 INTERNATIONAL RESIDENTIAL CODE CITY. OF, BLAIR REROOFING CHECKOFF SHEET Return to l Ir C ity Ha ll prior to in l Inspection i 218 S 16 th S treet, Blai NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. Property Address; v55 J n c J a ST Contractor or Homeowner (if self): Permit #; MS-20 installation Date. YES NO The materials and methods of application used for recovering or replacing the existi roof' covering comply with the requirerrients of the buildin g code. { g ` R907,1) #CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering, polymer modified bitumen sheet was installed and extends at least from the eave's edge to a paint at Fast 24 inches inside the exterior wall line of the bullding: (R605.2.7.1) STRUCTU,R.AL COMPt?IUgNTS ARE SOUND The structural roof components are capable of supporting, the roof covering system and the material and equipment loads that will be enceuritereu during installation of the roof covering system. (8907.2) i EXISTI �(JVERIN — W - - R___OVED. Existing, roof covering was removed for one of the reasons required by section- 8907.3 DID NOT USE RUSTED M TAL a SLASH# G; Existing vent flashing metal edges drain outlet , collars, or'metal counter f(a$l ing were riot reinstalled if rusted. (R907.5) FLASHlNO .STALLED P. FERL,Y; Flashing shell be reconstructed in accordance with approved manufacturer`s installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation. (R907.6) 7 Signature Date Sign of e o der li Date