Checkoff Sheet MS-2014-01103_0001.tif 2009 INTERNATI ONAL RESIDENTIAL CODE
CITY, OF, BLAIR REROOFI CHECKOFF SHEET
Return to i it C ity Ha ll prior to in i Inspection
t " Street, Blair, NE 68008
B ecause of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
faltQwina this reroofing jab,
Property Address: 14S q " I It j t r
Contractor or Homeowner (if self) : (�
i
Permit #: MS-2014-
Installation Date;
YES NO
The materials and methods of a pl? lication used for recovering or replacing the existing
roof covering comply with the require nts of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at feast 24 inches inside the exterior
wall 'line of the building: (R9O5.2.7. `( )
STRUCTURAL COMP ONENTS ARE SOUND; The structural ropf components are
capable of suppvrtin he,roof. covering system and the material and equipment loads
that will b4 encountered during insllatlon of the roof covering system. (R947.2)
EXISTING GOVERINO IMAS REMOVED-. Existing, roof covering was removed for one
of the reasons required by section 8007.3
DID NOT USE RUST FD METAL OR I'LASHI G; Existing vent flashing, metal edges,
drain outlets, collars, or metal counter #lashing were not reinstalled' if rusted. (R907.5)
LA HH1NQ 1N TALLED PROPERLY: Flashing- shall be rec onstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.0)
Si ary Installer Date
y_
Si erm r Bate