Loading...
CHECKOFF SHEET MS-2014-02664_0001.tif 09- 24 -'14 11:01 FROM- Absolute Customs T -151 P0004/0004 F -066 i 2009 INTERNATIONAL RES IDENTIAL CODE CITY OF BEAD. REROOFING CHECKOFF SH Return to Blair City Ha ll prior to Final Inspeotion 21a 3 1e Street, Blalr� NE &9008 Because of limitations cau-sed by the InfeasiblUtY W perform datsiled inspreetlons which Would Dot interfere with reroofing work, please Indicate compliance with the following requirements � following this reroofing job. 11'' Permit #; „ T / Installation Date: YES NO The materials and methods of application used for recovering or replaoing the existilig roof covering comply with the requirements of the building code. (R907.i) 110E p&O I'EC -'loN IltiV61 -LED An ice barrier thatconsists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet Was In k and eXtendS at least from the eaves qe to a paint at hest 24 Inches inside the exterior wait line of the building. (11905.2- S` RUC 1, CgNpONEt4TS A RF_ sollNDl - rho structural roof components are capable of supporting the roof covering system andllte material and equipment loads that will be encountered during Installation Of the reef covering system. (8907.2) EXISTING t7rl/Ei3i GAS pig OVF-D Existing roof covering was raynoved for acre of the reasons required by section 8007.3 rl 1N0 .RU ,9"CI o Mr- AL OR F1..ASE•ltNG! lxisting vent flashing, metal edges, drain outlets, collars or metal counter- flashing wekV not reinstalled if masted. (11907.5) pLASIJING INS' kU_ D p�01'1wRLY� Flashing shall be reconstructed in aocordance with approved manufacturer's installation instructions. Metal flashing to whlch bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Si ature oaf Primary Installer ate Signatrlra of ermlt Holder We } I I