CHECKOFF SHEET MS-2014-02663_0001.tif i
69- 24 -'14 11,01 FROM - Absolute Customs T -151 P0092/6004 F -666
2009 INTERNATIONAL I IAL CODE
TY OF B LAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Ir pection :
m s W" street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform datailed Irispeotions'which would
not lnterrere with refoolloa work, please indicate oomplianoe With the following requirements
following, this reroofing Job.
Permit 0: � r �
In stallation Date.
YES Nth
The materiels and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (ROO1-i)
ICE PROTECTION INSTALLED: An ice barrier that consists of at IeW two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
extends at least from the eave's edge to a point at lea 94 inche i sid$ the exterior
wall line of the building. (R9O5.2.7.1)
} STRIjOTURAL CoMp'GNIyNTs ARF- SOUND- The structural roof components are
capable of supporting the roof covering sys and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EX USTiNG Ctllfl E�1 3G WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
Mo pUSTU j METAL, oR i= LASHING • Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were ilea reinstalled if rusted, (11907.5)
FLASHING INS r &LED p'FtOPE LY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructicns. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8997.6)
Sr azure o f Primary Installer
Date
Date
Signatrtre jolerm
i
'I