Loading...
CHECKOFF SHEET MS-2014-02663_0001.tif i 69- 24 -'14 11,01 FROM - Absolute Customs T -151 P0092/6004 F -666 2009 INTERNATIONAL I IAL CODE TY OF B LAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Ir pection : m s W" street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform datailed Irispeotions'which would not lnterrere with refoolloa work, please indicate oomplianoe With the following requirements following, this reroofing Job. Permit 0: � r � In stallation Date. YES Nth The materiels and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (ROO1-i) ICE PROTECTION INSTALLED: An ice barrier that consists of at IeW two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at lea 94 inche i sid$ the exterior wall line of the building. (R9O5.2.7.1) } STRIjOTURAL CoMp'GNIyNTs ARF- SOUND- The structural roof components are capable of supporting the roof covering sys and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EX USTiNG Ctllfl E�1 3G WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Mo pUSTU j METAL, oR i= LASHING • Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were ilea reinstalled if rusted, (11907.5) FLASHING INS r &LED p'FtOPE LY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructicns. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8997.6) Sr azure o f Primary Installer Date Date Signatrtre jolerm i 'I