Loading...
CHECKOFF SHEET MS-2014-02662_0001.tif I 09- 24 -'14 11,91 FROM - Absolute Customs T -151 P000319904 F -066 �q , 2009 INTERNATIONAL RESI CODE C ITY OF BEAD. REROOFING CHECKOFF SHEEN" Return to Blair City Hall prior to final inspection : 218 8 16 Street, Blair, WE 68008 Because of limitations caused by the Infeasibility to perform dotailed inspeotions Which would not Interfere with reroofing work, phase indicate eompi!AnG : with the following requirements following this reroofing jab. Permit ifi: Installation] Date. YES No The materials and methods of application used for recovering cr replacing the existing rogf covering comply with the requirements of the building code. (R9o7.1) ICE PROTECTION INSTAL Eli: An ice barrier that consists of at least tuvo layers of underlayment or of a self polymer modified bitu sheet w�� and extends at bast front he cave's ed a to a point at least 24 inche inside the exterior wall line of the building. (R9O5.2.7.1) S'1iRUGTURAL coldlpClm ARE SOU a: ThestruclUl -1 roof Gcmprarlents are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering syste►n• (R907.2) ® 7= 7tISTI G COVER WAS R MQVED Existing roof covering was removed for one of the reasons required by section 8907,3 ` NO RUSTE0 ME�`A O� I= L A�HIl�1C: E= elsking vent flashing, rnBtal edges, drain outlets, cellars or metal counter flashing were not reinstalled if rusted. (8907.5) PLf�,5l list TALLI =f 1' l`rPE t . dashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8997.6) q slga ure of � Prima � r&et � aller hate Gate lgnsiture of srmit Holder l i i