CHECKOFF SHEET MS-2014-02662_0001.tif I
09- 24 -'14 11,91 FROM - Absolute Customs T -151 P000319904 F -066
�q
,
2009 INTERNATIONAL RESI CODE
C ITY OF BEAD. REROOFING CHECKOFF SHEEN"
Return to Blair City Hall prior to final inspection :
218 8 16 Street, Blair, WE 68008
Because of limitations caused by the Infeasibility to perform dotailed inspeotions Which would
not Interfere with reroofing work, phase indicate eompi!AnG : with the following requirements
following this reroofing jab.
Permit ifi:
Installation] Date.
YES No
The materials and methods of application used for recovering cr replacing the existing
rogf covering comply with the requirements of the building code. (R9o7.1)
ICE PROTECTION INSTAL Eli: An ice barrier that consists of at least tuvo layers of
underlayment or of a self polymer modified bitu sheet w�� and
extends at bast front he cave's ed a to a point at least 24 inche inside the exterior
wall line of the building. (R9O5.2.7.1)
S'1iRUGTURAL coldlpClm ARE SOU a: ThestruclUl -1 roof Gcmprarlents are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering syste►n• (R907.2)
® 7= 7tISTI G COVER WAS R MQVED Existing roof covering was removed for one
of the reasons required by section 8907,3
` NO RUSTE0 ME�`A O� I= L A�HIl�1C: E= elsking vent flashing, rnBtal edges, drain
outlets, cellars or metal counter flashing were not reinstalled if rusted. (8907.5)
PLf�,5l list TALLI =f 1' l`rPE t . dashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8997.6)
q slga ure of � Prima � r&et � aller hate
Gate
lgnsiture of srmit Holder
l
i
i